Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
The Philippines Pavilion at Expo 2020 Dubai, called “Bangkóta,” was designed to represent the rich cultural heritage, creativity, and resilience of the Filipino people. The pavilion was one of the highlights of the Expo, attracting attention for its unique design and engaging exhibits.
The Philippines pavilion features an intricate mesh pattern around the building that forms its unique facade. This complete steel structure includes a water feature, external elevator tube and spiral ramp.
DUBAI, United Arab Emirates – In a scheduled visit to the construction site for the Philippines’ pavilion, Her Excellency Hjayceelyn Quintana, Philippine Ambassador to the United Arab Emirates (UAE), expressed her satisfaction about final stages of the work.
Safety achievement of 200 thousand safe manhours without loss time incident
Welcome to the journey of creating the Bangkóta Pavilion – a testament to Filipino resilience, creativity, and cultural heritage at Expo 2020 Dubai, delivered by RAQ.