EAST MIDFIELD CARGO TERMINAL

EAST MIDFIELD CARGO TERMINAL

BUILT UP AREA

82,930.4 SQM

YEAR

2024

LOCATION

Zayed International Airport, Abu- Dhabi

EMPLOYER

AD AIRPORTS, ETIHAD CARGO

USE

Cargo terminal

STRUCTURE

Steel

SEGMENT

Commercial

SUB-SEGMENT

Terminal

PROJECT STATUS

On-going

Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
×