RAQ

Freight Complexes

F reight Complexes

BUILT UP AREA

39985 S.QM

YEAR

2026

LOCATION

Logistics District, Dubai South

EMPLOYER

Dubai South Properties DWC-LLC

Contract

Awaj

STRUCTURE

Steel

SEGMENT

Commercial

SUB-SEGMENT

Logistics & Warehouses

PROJECT STATUS

Ongoing

A modern logistics and industrial development designed to support Dubai South’s growing aviation and freight ecosystem. The project features efficient warehouse and distribution facilities, dedicated loading bays, spacious access areas, and contemporary office spaces—providing a strategic environment for seamless cargo handling, storage, and logistics operations.
Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
×

Geocoding Error Occured.

Tried to Geocode:

Error Type:

Please be sure to follow the tutorial on how to setup the Google APIs required for the Advanced Google Map Widget.

Google Map API Key Tutorial