Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
The G+2 Specialty Clinic is a fast-track project delivered in partnership with Dubai Healthcare Authority and DP World, where the end-users are a company named Aviv.
The project features new-age medical procedures that are elective for the citizens and residents of the United Arab Emirates.
Aviv focuses on brain performance and its specialty wings, offer the latest advancements in assessing, treating, and improving cognitive and physical performance:
1. Hyperbaric Wing with our state-of-the-art hyperbaric oxygen treatment suites2. Neurocognitive Wing for cognitive evaluation and training3. Physiological Wing for physiological assessment and therapy4. Biological Imaging Wing – Including novel MRI protocols, Genome Mapping, and a Cellular lab
The entire project, from design to completion, spanned around 7 months. While this was a design and build project, the major concerns were existing services pre-built in JLT cluster F.
DMCC’s assistance on this project was paramount. With the help of Yaghmour and PMK, NOCs and authority (DMCC) requirements were smoothly handed over within a month of kick-off.
The design of the carpark was inspired by Etihad Bank in Jordan. This automated carpark helps visitors find parking in what is already a congested area of development.
In November 2020, the HBOT machines were scheduled to arrive in UAE from its manufacturing facilities. RAQ with the help of DP World and Aviv documented the entire process from Port to Installation in a short video.