Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
With an elite sense of smell 10,000 times greater than humans, dogs make the perfect detectives – and the K9 unit at Dubai Customs is helping catch criminals and thwart the illegal flow of narcotics and explosives into the UAE’s borders.
The team, ably supported by 63 professional trainers, is made up of 73 animals from six breeds – German shepherd, Dutch shepherd, Belgian Malinois, English springer spaniel, Labrador retriever and cocker spaniel.
The dogs assisted the force in conducting 1,321 security checks, 480 guard duty posts, 381 security patrols, 53 anti-drug operations, 20 raids, 11 fire detections, 542 Covid-19 screenings and another 879 special assignments at Expo 2020 Dubai during a busy 12 months.
×