RAQ

Construction, Completion and Maintenance of Warehouses & (Ground Only)

L ight industrial units for Al Midfaa Investments

BUILT UP AREA

13456 SQM

YEAR

2017

LOCATION

Sharjah

EMPLOYER

Al Midfaa Investments Group LLC

Use

Awtar Engineering Consultancy

STRUCTURE

Steel Structure

SEGMENT

Industrial Buildings

SUB-SEGMENT

Manufacturing Plants and Factories

PROJECT STATUS

Completed

Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
×

Geocoding Error Occured.

Tried to Geocode:

Error Type:

Please be sure to follow the tutorial on how to setup the Google APIs required for the Advanced Google Map Widget.

Google Map API Key Tutorial