G+5 Carpark Building with associated services

M ultistory carpark for DP World at Technopark

BUILT UP AREA

211266 SQM

YEAR

2016

LOCATION

Emirates Industrial Park

EMPLOYER

EZW/Dp World

Use

Orbit Engineering Consultant

STRUCTURE

Precast

SEGMENT

Commercial Buildings

SUB-SEGMENT

Carparks

PROJECT STATUS

Completed

Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
×