Skip to main content

RAQ

Design & Construction of Aircraft Hangar for BAT DWC LLC on Plot AC-C25A at Al Maktoum International Airport

N arrow body MRO hangar for Air Support Baltic

BUILT UP AREA

3694 SQM

YEAR

2023

LOCATION

Dubai

CLIENT

Airline Support Baltic BAT DWC LLC

CONSULTANT

NASSA

STRUCTURE

RCC & Steel

SEGMENT

Commercial Buildings

SUB-SEGMENT

Aircraft Hangars

PROJECT STATUS

Completed

Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
×

Geocoding Error Occured.

Tried to Geocode:

Error Type:

Please be sure to follow the tutorial on how to setup the Google APIs required for the Advanced Google Map Widget.

Google Map API Key Tutorial