Amazon build to suit (BTS), Fulfilment Centre for phase one is located in Industrial City of Abu Dhabi (ICAD) which is a free zone dedicated to industrial processes. Spanning across 40 sq. km. ICAD is part of Musaffah, a popular industrial district located in the southwest of Abu Dhabi. The master development is one of the most important economic zones in the UAE housing several factories and a port.
Once soil has been improved and the plot leveled by another contractor, RAQ will begin the execution project for the Amazon fulfillment center. Client targeted time duration for the completion of “Build to Suit (BTS), Fulfilment Centre (FC) Phase 1 – “AUH1” project will be in 14 months (420 days).
The project has been directly commissioned by Amazon USA and is run with their standards.
As always, we plan our project in phases and divide areas in zones for easy deployment of resources.
Erection of steel starts of in Zone 2. We start the erection from the left; this is the absolution center of the entire building.
The SATYS paint hangar, spanning 2,831 square meters in Dubai South (Dubai World Central), is a specialized facility designed for aircraft painting and maintenance. Constructed from a combination of steel and reinforced concrete, this structure exemplifies modern engineering tailored for the aviation industry. Its strategic location in a key aviation hub underscores Dubai’s commitment to reinforcing its global standing in aviation, logistics, and commercial sectors, catering to a broad spectrum of aircraft with advanced maintenance and aesthetic services.
This video dives into the intricate construction process of the SATYS Paint Hangar in Dubai South, Witness how this state-of-the-art facility was meticulously designed and built to serve as a pivotal aviation maintenance hub.
×